Pier to pier wireless installation
Well the original crew are all still around, many have moved away or are involved in other projects, we feel we should put this site back up and link it to our current projects. Skip to content. Why has this site come back? Wireless Hotspots — some were built for his former employer, some like the one at Darwin Sailing Club are similar to the PierToPier model. Mostly this has involved being nailed to a laptop and electricity, keep looking here as I try to figure out how to stream build wireless to stream live from boats, buoys and drones.
Having produced several live events at the Pier, the team at OSA was already familiar with the space and the local in-house crew at Navy Pier. Adding in an additional BSS signal processor with Dante dedicated to the Polk Bros Performance Lawns enabled the Pier to tie into the existing system to play venue-wide announcements or background music when the stages are not in use.
The Polk Bros Performance Lawns at Navy Pier now have the sound system in place to host an array of live events, as well as the perfect infrastructure for a professional staging company to expand the system for a premiere event.
And, upon completion of the project, Navy Pier had one additional request: OSA was tasked with installing an LED wall for the Pier, which could act as a backdrop for concerts or be utilized to show movies. JBL Professional Loudspeakers. Fiber tie line from the Pier. Martin Audio Loudspeakers. The total includes excavation, forming materials, reinforcing steel, PSI concrete and installation.
The size of the foundation will influence the cubic yard pricing provided. Prices will vary based upon soil conditions, location and additional design requirements. Add concrete testing to your proposal. The port engineer at a container ship facility wanted to verify that nearby dredging operations did not affect load distribution on sheet pile cofferdam cells of the pier.
He specified the installation of load cells across the sheet joints that were closest to the dredging. The load cells would be located at the bottom, middle, and top of the cell wall and monitored continuously.
In addition, he specified that data collection equipment must not obstruct access to the pier or interfere with longshoreman operations. GEO-Instruments provided weldments to act as bearing surfaces for the underwater load cells, and a data logging system to collect readings from the load cells.